MIL-C-52009D
4. VERIFICATION
4.1 Classification of inspections. The inspections and testing of control-panel assemblies shall be
classified as follows:
a.
First article inspection (see 4.3).
Conformance inspection (see 4.4).
b.
4.2 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the
contractor is responsible for the performance of all inspection requirements specified herein. Except as
otherwise specified in the contract or purchase order, the contactor may use his own or any other facilities
suitable for the performance of the inspection requirements specified herein, unless disapproved by the
Government. The Government reserves the right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to assure supplies and services conform to
prescribed requirements.
4.2.1 Disassembly inspection. Failure of any examination or test by the preproduction model shall be
cause for disassembly, in the presence of a Government representative, of the preproduction model to
the extent necessary to determine the cause of the failure. Each disassembled part shall be examined in
detail for compliance with this specification and referenced drawings in regard to materials, dimensions,
tolerances, and workmanship. Parts not complying with such requirements shall be rejected.
4.2.2 Component and material inspection. The contactor is responsible for insuring that components
and materials used are manufactured, examined, and tested in accordance with referenced specifications
and standards.
4.3 First article inspection.
4.3.1 Examination. The first article control-panel assembly shall be examined as specified in 4.5.1.
Presence of one or more defects shall be cause for rejection and for performing the disassembly
inspection specified in 4.2.1.
4.3.2 Tests. First article inspection shall subject one control-panel assembly to the examination and
tests specified in 4.5.2. The manufacturer shall provide verification to the procuring activity that the first
article inspection and tests have been performed on the control-panel assembly supplied to the
requirements of this specification. One or more failures of first article tests shall be cause for rejection
and for performing the disassembly inspection specified in 4.2.1.
4.4 Conformance inspection.
4.4.1 Examination. Each control panel shall be examined as specified in 4.5.1.
4.4.2 Tests.
4.4.2.1 Operation. Each control panel shall be tested as specified in 4.5.2.1. Failure of the test shall be
cause for rejection.
4.4.2.2 Operational reliability. Samples selected in accordance with table I shall be tested as specified
in 4.5.2.4.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business