MIL-C-52009D
DEPARTMENT OF DEFENSE SPECIFICATIONS
- Treatment and Painting of Material.
DEPARTMENT OF DEFENSE STANDARDS
- Definitions of and Basic Requirements for Enclosures for Electric and
Electronic Equipment.
- Marking for Shipment and Storage.
- Identification Marking of US Military Property.
(Copies of these documents are available online at https://assist.daps.dla.mil/quicksearch/ or from the
Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-
5094.)
2.2.2 Other Government documents, drawings, and publications. The following other Government
documents, drawings, and publications form a part of this document to the extent specified herein.
Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract.
US ARMY COMMUNICATIONS-ELECTRONICS COMMAND
- Control Panel Assembly
(Copies of specifications, standards, and drawings required by contractors in connection with specific
procurement functions should be obtained from the procuring activity or as directed by the contract
officer).
2.3 Order of precedence. In the event of a conflict between the text of this document and the
references cited herein (except for related specification sheets), the text of this document takes
precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a
specific exemption has been obtained.
3. REQUIREMENTS
3.1 Description. The control-panel assembly shall be as shown on Top Assembly TA13217E7550 and
as specified herein. The control-panel assembly shall have one input connector receptacle for accepting
115/120 volts, AC, 60 Hz; one output connector plug; and three output connector receptacles. The output
voltage at the output connector receptacles shall be individually controlled by autotransformers. The
control-panel assembly shall be provided with a pilot light and a circuit breaker for protection of the
autotransformers from overload. The components shall be enclosed with a splashproof, spraytight, metal
case.
3.1.1 Drawings. The drawings forming a part of this specification are end product drawings. No
deviation from the prescribed dimensions or tolerances is permissible without prior approval of the
contracting officer. Any data (e.g. shop drawings, layouts, flow sheets, processing procedures, etc.)
prepared by the contractor or obtained from a vendor to support fabrication and manufacture of the
production item shall be made available, upon request, for inspection by the contracting officer or his
designated representative.
3.2 First article (preproduction model). When specified (see 6.2), the contractor shall furnish one
control-panel assembly for examination and testing within the time frame specified (see 6.2) to prove prior
to starting production that his production methods will produce control-panel assemblies that comply with
the requirements of this specification. Examination and tests shall be as specified in Section 4 and shall
be subject to surveillance and approval by the government (see 6.3).
2
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business