MIL-DTL-917F(SH)
TABLE XXIV. Conformance inspections.
Tests
Requirements paragraph
Conformance inspection
Reliability demonstration
Maintainability demonstration
Input power
Inclined operation
Temperature
Humidity
Shock
Vibration
Electromagnetic interference
DC magnetic field environment
Magnetic field reduction
and 3.2.18.3
Noise control - general
Airborne noise
Structureborne noise
Leakage current test
Dielectric withstand voltage
Insulation resistance
Wind speed
3.2.27 and 3.2.27.1
Ice
3.2.27 and 3.2.27.2
Insulation suitability
Partial discharge test
Manufacturing screening
---
Low quantity and non-QPL
---
qualified transformers and
inductors
Inspection requirements for low
---
quantity and non-QPL
transformers and inductors
70
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business